Directed Electronics equalizer 2500 Uživatelská příručka Strana 103

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 154
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 102
Load a Flow Cell
HiSeq 2500 System User Guide
93
Figure 45 Flow Cell Positioned Against Top and Right Guide Pins
A Top Guide Pin
B Right Guide Pins
NOTE
Remove your hand from the flow cell before engaging the vacuum switch to prevent
possible alignment drift over time.
3 Slowly move the flow cell lever to position 1 to engage the vacuum and secure the flow
cell into position. When the flow cell lever is green, the vacuum is engaged.
Figure 46 Flow Cell Lever in Position 1
4 Wait for about 5 seconds, and then slowly move the flow cell lever to position 2. When
the flow cell lever is solid green, the manifolds are in position and the flow cell is
ready for use.
Zobrazit stránku 102
1 2 ... 98 99 100 101 102 103 104 105 106 107 108 ... 153 154

Komentáře k této Příručce

Žádné komentáře